top of page

DEEP WELL & GEOLOGICAL WORKS

Well.jpg
DEEP WELL 
SPT.jpg
 GEOLOGICAL WORKS
Excavation.jpg
CONSTRUCTION WORKS

1. EXCAVATION WORK

2. UNDERGROUND PIPE LINE 

1. GEOPHYSICS SURVEY

   - Resistivity survey

   - Geological map

2. WATER WELL

   - Deep Well Construction (300-600 m.)

1. SURVEY

   - Soil Investigation

   - Land surveying

2. FOUNDATION WORKS

   - Drilling, Piling,

   - Concrete work

installation.jpg
Control Panel.jpg
subsidence.jpg
Concrete tank.jpg
MECHANICAL & ELECTRICAL
GROUND SUBSIDENCE
CONCRETE WORKS

1. MECHANICAL WORKS

   - Piping work

   - Pump installation work

2. ELECTRICAL WORKS

   - Electrical work

   - Control Panel installation

1. JET GROUTING

2. SOIL CEMENT

3. PILING WORK

1. CONCRETE TANK

   - Water tank

   - Waterproof, Epoxy proof, PE Lining

2. CONSTRUCTION & ARCHITECTURE

   - Small Building

bottom of page